This was a particularly complicated job. In addition to the normal regulations and chemical security involved, this job had a failed tar and gravel roof with asbestos. Because of that, FPL prohibited the use of power tools to remove the roof. Whiting Construction broke up each piece of the roof by hand and sent it down 7 stories. A Whiting waterproof SPF coated roof was installed.
Photo 1 is BEFORE, Photos 2 & 3 are AFTER.