This was an extremely complicated job due to logistics and limited access. To add to the complexity, it rained every day. Whiting Construction replaced a failed modified bitumen roof, applying SPF directly to the concrete deck. Elastomeric coating was applied on top of the SPF.
The 1st two photos are BEFORE, and the last three photos are AFTER.